Project Description

PRODUCT:
Moisture Cured Urethane


PROJECT:
ORIGINAL TEXT:The recoat procedure of gym sport floor 7500 sq ft was performed during Christmas closure in order to reduce impact to programing.

RICHARD WROTE: Existing floor finish was worn and had lost its luster and traction and was in need of a recoat application. We scrubbed/screened/prepared and recoated the floor.Work was performed during their Christmas shutdown period in order to lessen the impact on programming.